May 4th- Deck is being prepared for concrete. Today, I stopped by to visit our wonderful contractors and the bathroom walls and ceilings are painted, new shower heads and necessary plumbing is complete and the electrician installed energy efficient LED lighting throughout! What a huge difference these upgrades have made to the pool.

April 23, 2019- Some much has happened over spring break! Our baby pool concrete and coping tiles are in. Also, our main pool stairs have been widened. Can’t wait to see the new pool surface.
April 9, 2019- Wow, look at the new pool coping tile and all of the new piping. I can’t wait to see our new baby pool!
April 7- This beautiful Sunday made for a great walk around the pool grounds checking out the construction. Lots of new piping to and from the filter pit. It is amazing how much was hidden under concrete.
April 2- A new roof has been installed on our Pool building. No more leaks!

March 19, 2019- Since our good weather continues, so does the work on the pool. Framing for our new beach entry baby pool has begun! Also, our pool building will have it’s new roof in a few weeks.
March 17, 2019- Demo is complete!
March 11, 2019- Nicer weather makes for a good demolition day. Can’t wait to see the new baby pool and widened pool stairs.

10 March 2019- Preparations for construction began this week with the removal of our dive boards and dive block stanchions and the pool water is well over 50% drained. Also, construction equipment is beginning to arrive.